NewimprovedfixedTimefold PlatformEmployee Shift SchedulingField Service RoutingTask SchedulingPickup & Delivery Routing
Organizations for your tenants, reserved shift time for urgent visits in FSR, waiting time limits in PDR, and more
Today, we're announcing version v1.17 of the Timefold Platform and updates to the Timefold models.
This new version of the Timefold Platform comes with these platform improvements:

- Manage your tenants as one organization: On Timefold Cloud, an organization now groups your company's tenants under one plan. Each tenant has a tenant type, Production, Testing, or Development, shown as a badge in the tenant switcher, so you always know which environment you are working in. Organization admins manage the organization themselves underOrganization settings: they invite members, add Production tenants in setups with multiple Production tenants, and set the model release lag per tenant type (Latest,1 release behind, or2 releases behind). This lets you validate a new model release in your Testing tenant before it reaches production. Model admins register custom models under the organization's namespace. The organization'sMemberspage shows how many unique users the organization and its tenants have. To get an organization, contact Timefold. See Manage organization for more details.
- Auto-select the transport type for each dataset: A configuration profile can now auto-select the transport type for each dataset, with the newAuto-select (all transport types)map location. This map location is the default for new profiles. See Automatic map selection for more details.
- Describe your planning problem with PRD Assistant: PRD Assistant interviews you about your planning problem and turns your answers into a product requirements document (PRD), in the structure the Timefold team uses to build optimization models. You can download the PRD, or submit it to the Timefold team to have a model built. This is useful when you want to use Timefold Platform features for your own custom model: a model built from your PRD runs on Timefold Platform, with the same platform features as the Expert models. TheCustom Optimization APItile in the model catalog now links to PRD Assistant.
- Find your profile menu in the top-right corner: You can now open the profile menu from the top-right corner of the header. It replaces the cogwheel. Select your profile picture, or your initials when you have no picture.
- Several improvements and bug fixes:This release also brings several smaller improvements and bug fixes, including new FAQs on modeling and replanning, more statistics in CSV comparison exports, a visualization that follows the platform theme, and more stable dataset solving.
Next to that, this new version of the Timefold Platform comes with updates to these Timefold Models:
- Account for the time between sub-locations of the same location: Visits can now have asubLocationId, such as an apartment number in a building where all apartments share the same coordinates. UsedurationAddedBetweenSubLocationsto add time, such as walking or taking the elevator, when a technician moves between two sub-locations of the same location. The model does not adddurationAddedBetweenSubLocationswhen the technician arrives from a different location:durationAddedForFirstVisitOnLocationapplies then. See Duration added between sub-locations for more details.
- Reserve shift time for urgent visits: Urgent visits often come in during the day, but a fully booked shift leaves no time for them. You can now reserve part of a shift for high-priority visits only. Add acapacityReservationsarray to a vehicle shift or a linked shift. Each capacity reservation has astartTime, anendTime, and arule. The first introduced rule, thePRIORITYrule, permits only visits with a priority equal to or higher thanlowestAllowedPriority. The newreservedCapacityinput metric shows the total time of the capacity reservations in your dataset. To see how much of the reserved time your technicians use, the shift and vehicle metrics and the KPIs include the newtotalReservedCapacityandusedReservedCapacitymetrics.usedReservedCapacityis the time of the capacity reservations that the technicians use for the travel to visits and for their service. See Reserved capacity in the output and Capacity reservation for more details.
- Lunch breaks stay on their own day in a linked shift: In a linked shift, a floating break without amaxEndTimefrom one of its shifts could move to the next day, after the night, with no penalty. Such a break'smaxEndTimeis now automatically set to the end of its own component shift, so the break behaves the same as when the shift is used alone. The end of the shift is itsmaxLastVisitDepartureTime, or itsmaxEndTimeifmaxLastVisitDepartureTimeis not set. See Breaks in a linked shift for more details.
- Solving starts sooner for large datasets: The model now prepares large datasets faster before it starts to optimize. It now calculates the visits that each shift can do only once, instead of again at the start of each optimization phase. More of the solve time is now available to improve the route plan.
- Visualization improvements and bug fixes:The visualization now shows the right skills for linked shift visits, names both days for shift hours that ends at midnight, and shows the correct timeline across the October daylight saving change. It also has a steadier date control, wraps long tooltip values, and uses a slightly different yellow for breaks.
- Clearer visualization controls and hover cards: This release includes these visualization improvements: You can type a date in the date control. On theEfficiency X-Raypage, a chart's explanation opens in a tooltip from a help icon, instead of in a card. When you hover a table row, the highlight now also covers the first column, such as the employee name on theEfficiency X-Raypage. When the visualization runs in Timefold Platform, it now uses the platform's light or dark mode. This release also fixes these bugs: The timeline now shows the right times across a daylight saving time change. TheEfficiency X-Raypage no longer crashes when you change theGroup byoption after a chart bar card opened. Several smaller display fixes, for example in the worked hours that show before the model reports its metrics. See Visualization for more details.
- Assignability analysis details include the constraint justifications: The assignability analysis detail endpoint now returns the details of each broken hard constraint, for example the skills that an employee is missing. Call/v1/schedules/<ID>/assignability-analysis/details/<SHIFT_ID>withincludeJustifications=true. Each employee in the response then gets afailureslist with each broken hard constraint and its justification. Without the parameter, the response doesn't change. See Assignability analysis for more details.
- More accurate weekend counts in weekend rules: Rules that count weekends now count each weekend once, in each employee's own time zone. This applies to rules such as weekends worked per period, weekends worked in a rolling window, and consecutive weekends off per period. This release fixes these weekend counts: The planning windowendis exclusive, and the model no longer counts that day as a weekend day. A weekend that ends on the last day of a month no longer counts again in the next month. A weekend before the first period no longer counts for that period. The model numbers weekends in each employee's time zone. A partial weekend day in one employee's time zone no longer adds a weekend for every employee with the same contract. This can change the score of existing schedules.
- Shift generation no longer misses shifts that start before their demand: Shift generation now considers every date from which a shift template can cover the demand. Shift generation no longer misses shifts that start on an earlier date than the demand they cover. When all demand details of an hourly demand rule end before the planning windowstart, shift generation now returns this validation error:HOURLY_DEMAND_RULE_ALL_DEMAND_HISTORIC.
- Scheduling and validation fixes:Required daily shift pairings now respect employee eligibility, and shift generation stays within its maximum. Validation no longer fails with an unexpected error for several rule combinations, and a custom period no longer gets a wrong daysOffMin warning. Percentage KPIs also keep two exact decimals, and the workingTimeFairnessPercentage KPI works when no employee worked.
- Limit how long drivers wait at a stop: You can now limit how long a driver waits before starting the service at a stop, for example five minutes at the pick-up and two minutes at the delivery. Stops have two new optional attributes:maxWaitingTime, where the new hard constraintMaximum waiting timepenalizes waiting longer, andmaxSoftWaitingTime, where the new soft constraintPreferred maximum waiting timepenalizes waiting longer and you configure its weight withpreferredMaxWaitingTimeWeightin the model configuration. Both constraints are only active when at least one stop sets the corresponding attribute. The input validation reports negative values as errors. See Maximum waiting time per stop for more details.
- Balance the workload fairly across drivers: Uneven workloads are a common cause of driver burnout and turnover. The newBalance time utilizationsoft constraint spreads the work so that each driver uses a similar share of their available time. It's off by default: setbalanceTimeUtilizationWeightin the model configuration to turn it on. To balance the workload over a longer period, add each driver's past working time and availability with the newhistoricalTimeUtilizedandhistoricalTimeCapacityfields. See Fairness for more details.
- Set job durations based on job dependencies: A dependency can now setsameDurationtotrue. The following job then takes the duration of the preceding job, which depends on which resource Timefold assigned to the preceding job. An operator job that starts with a machine job now lasts exactly as long as the machine job, even when the duration of the machine job depends on the machine. See The following job takes the duration of the preceding job for more details.
- Better first schedules for jobs that must start together: When jobs must start together, for example a machine task and the operator who runs it, Timefold now builds the first schedule in time order. Timefold schedules such jobs together, on the resources where they finish earliest, and the most urgent jobs first. Previously, Timefold scheduled the jobs one by one, so the order on a machine and the order on its operator often did not match, and jobs waited for each other. A job with a fixed window on one resource, such as planned downtime of a machine (minStartandmaxEndon a job that can only run on that machine), now keeps its place in the first schedule, so another job can't run into it. In a job shop with 50 jobs, ten machines, and five operators, the number of late jobs after two minutes of solving went down from about 30 to four. Now, when the model improves the schedule, it moves jobs that must start together as one. When it moves a machine task, it also moves the operator job to the matching place in the operator's schedule. Before, it moved one job at a time, which made both jobs wait, so it rarely found a better schedule. See Delay between dependent jobs for more details.
- Clearer timelines in the visualization: A job that pauses during an unavailable time span of its resource now shows as one bar for each part in which it works. The job's details show how long it pauses. The visualization also includes several smaller fixes, such as correct times on the timeline across a daylight saving time change.
Please let us know if you have feedback.