Ability to model accurate costs for multiday shifts using linked daily shifts
in progress
Jurriaan Persyn
When planning multiday itineraries (e.g. a technician traveling to a distant location for several days), the current workaround is to model a single long shift with hotel breaks. This leads to wrong cost calculations.
We'd like a way to link individual daily shifts together, so that costs are calculated per working day rather than across the full multiday span. This would produce accurate cost reporting and prevent the optimizer from generating solutions where visits are clustered on a single day while costs are counted for the entire week.
Log In
Jurriaan Persyn
marked this post as
in progress